Laminate / LVT Installation Guide

May 2, 2021
Flooring Options

Introduction

Welcome to JC's Flooring's comprehensive installation guide for laminate and luxury vinyl tile (LVT) flooring. Whether you are embarking on a DIY home improvement project or hiring a professional, this guide will equip you with the necessary knowledge and step-by-step instructions to ensure a successful installation.

Why Choose Laminate and LVT Flooring?

Laminate and LVT flooring are popular choices among homeowners for various reasons. Their durability, affordability, and versatility make them ideal for any room in your home. From kitchens to bathrooms, laminate and LVT flooring offer a wide range of styles and colors to suit your interior design preferences.

Before You Begin

Prior to starting your installation project, it is important to prepare the necessary tools and materials. Ensure that you have the following items:

  • Laminate or LVT flooring planks/tiles
  • Underlayment
  • Tape measure
  • Utility knife
  • Adhesive or click-lock system (depending on the flooring type)
  • Pry bar
  • Hammer
  • Spacers
  • Safety goggles and gloves

Step-by-Step Installation Process

1. Prepare the Subfloor

Before laying the flooring, ensure that the subfloor is clean, dry, and level. Remove any existing flooring materials and repair any visible damage. Sweep and vacuum the subfloor to eliminate any debris or dust. If necessary, use a leveling compound to even out any uneven areas. This step is crucial for a smooth and long-lasting installation.

2. Acclimate the Flooring

Allow the laminate or LVT flooring planks/tiles to acclimate to the room's temperature and humidity for at least 48 hours. This will minimize the risk of expansion or contraction after installation.

3. Install the Underlayment

Lay the underlayment over the prepared subfloor. Ensure that each row overlaps the previous row and secure them together using adhesive or tape. The underlayment provides cushioning, sound reduction, and moisture resistance for your flooring.

4. Start Laying the Flooring

Begin the installation process from a corner of the room, preferably opposite the main entrance. Lay the first row of planks/tiles parallel to the longest wall, leaving a 1/4-inch gap between the planks/tiles and the wall for expansion. Use spacers to maintain consistent gaps throughout the installation.

5. Connect the Planks/Tiles

If using adhesive, apply it to the tongue edge of each plank/tile before connecting them together. If using a click-lock system, follow the manufacturer's instructions for interlocking the planks/tiles. Ensure a snug fit by tapping gently with a hammer and a tapping block. Continue this process row by row until the entire floor is installed.

6. Trim and Finish

Measure and cut the last row of planks/tiles to fit against the wall using a utility knife. Remember to leave a 1/4-inch gap for expansion. Install any necessary transition pieces between different flooring materials or doorways.

7. Clean and Maintain

Once the installation is complete, thoroughly clean the floor using a manufacturer-approved cleaning solution. Regularly maintain the laminate or LVT flooring by sweeping, vacuuming, and occasionally damp mopping. Avoid using harsh cleaning agents or abrasive materials that may damage the surface.

Conclusion

Congratulations! You have successfully completed the installation of your laminate or LVT flooring. By following JC's Flooring installation guide, you have ensured a professional-looking outcome and enhanced the overall aesthetic appeal of your home. Enjoy your beautiful new floors!